This site uses javascript, some functionality and content is not working if javascript is disabled

H Constructions

H constructions are tested with HC fire curve in max. 120 min. These constructions are commonly used on platforms to protect people and expensive equipment.

The H constructions therefore differ from the A constructions in testing method – H constructions are tested at a higher temperature and in a longer time period.

On this page you can find drawings of H constructions.




More details on H constructions

Link to drawings

HC Firebatts 150

Ask a Technician